← BACK TO SOVA ASCENT LINEUPS
STEP 1 OF 2
STEP 2 OF 2
B Lobby - B Site Front
STEP 1 OF 2Step 2
Align the right square so that the left point is against the antenna and the bottom point with the top of the building (image 2) 0 BOUNCE, 2 POWER
STEP 2 OF 2Step 3
Sonar will land in the top right of site (image 3)