← BACK TO SOVA BIND LINEUPS
STEP 1 OF 2
STEP 2 OF 2
A Reveal From Backsite
STEP 1 OF 2Step 2
align first charge bar diamond under the right side of the sign (the second square thing)
STEP 2 OF 2Step 3
two bars
STEP 1 OF 2align first charge bar diamond under the right side of the sign (the second square thing)
STEP 2 OF 2two bars