← BACK TO SOVA FRACTURE LINEUPS
STEP 1 OF 2
STEP 2 OF 2
Dish to top Site Post Plant
STEP 1 OF 2Step 2
Aim the right tip of your left HUD line onto the middle of the metal wire and the dish on the line.
STEP 2 OF 2Step 3
Do a NORMAL THROW and the molly will land to cover top site Plant.