← BACK TO SOVA ICEBOX LINEUPS
STEP 1 OF 2
STEP 2 OF 2
Recon for B Plant From Hut
STEP 1 OF 2Step 2
Align the bar of the second load with the end of the gray peak of the crane (Picture 2)
STEP 2 OF 2Step 3
1 Charge 0 Bounces
STEP 1 OF 2Align the bar of the second load with the end of the gray peak of the crane (Picture 2)
STEP 2 OF 21 Charge 0 Bounces