← BACK TO BRIMSTONE PEARL LINEUPS
STEP 1 OF 2
STEP 2 OF 2
Post-plant Mid Plaza to B Default
STEP 1 OF 2Step 2
Align the left side of the line between the stim beacon and the molly on the BOTTOM of this leaf. (Must be precise)
STEP 2 OF 2Step 3
Shoot the molly. This molly takes 8 seconds to land.