← BACK TO BRIMSTONE ABYSS LINEUPS
STEP 1 OF 2
STEP 2 OF 2
A Lobby to A Default
STEP 1 OF 2Step 2
Line up the dot of the molly indicator with the top right edge of the awning.
STEP 2 OF 2Step 3
Molly lands A default
STEP 1 OF 2Line up the dot of the molly indicator with the top right edge of the awning.
STEP 2 OF 2Molly lands A default