← BACK TO BRIMSTONE ASCENT LINEUPS
STEP 1 OF 2
STEP 2 OF 2
Post Plant: Molly on top of Generator
STEP 1 OF 2Step 2
Align yourself so that the Stim Beacon and the Molly are positioned in the space between the tower debris. (Image 2)
STEP 2 OF 2Step 3
It takes approximately 4–5 seconds for the Molly to land. (Image 3)