← BACK TO SAGE BIND LINEUPS
STEP 1 OF 2
STEP 2 OF 2
Bind A Short to Truck Plant Viper Post Plant
STEP 1 OF 2Step 2
Aim the left tip of the left hud line onto the far right handle of the water valve.
STEP 2 OF 2Step 3
Do a normal throw and this will land in front of Truck Plant.